CNC Milling Machine Project Day 2

Today I worked on making the case for my electronics. I spent the morning at the woodshop installing a wood back panel in the PC case. After that I went back to shirley hall and reinforced the back panel and screwed it to the case. After that I spent time designing mounts for all my electronics inside the case. I also took the time to do some more design work on the CNC, where I started to lay out my motor mounts, and my electronics mount. I spent the rest of the afternoon researching what the wiring work the I will need to do, and also how to wire the PSU’s to mains power.                            

Comments

  1. Nate, Sounds like you are making progress. It would be great if you could post some photos of your project. Have fun Dan

    ReplyDelete

Post a Comment

Popular posts from this blog

CNC Milling Machine Project Day 4 Today I started out working on finalizing the fan mounts. This will include going to the metal shop to remove some of the aluminum where it would interfere with the airflow of the fan. After I finished my work on that I went down to the tech center to get some old scrap ethernet wires that I will be using as my stepper signal wires. I then started trying to wire up and example driver with my hardline cable, this was hard as the cables were brittle and would sometimes break off in the terminal blocks if I moved them around too much. I think that I might go to start using the patch cable with soldered ends. This would make the connection way more durable because it would be more flexible. Tomorrow I will be able to wire up and hopefully start testing stepper motors proving I find a way to wire the AC power to the stepper’s PSU.   

Monday and Tuesday

Day 13 Today I worked in the metal shop cutting and prepping things to weld. This was most of my morning / afternoon, all the pieces I need are cut, and I am starting to machine their faces to prep for welding. This is being done on both a horizontal and vertical mill. The goal of this is to get really flat and square parts before welding so that the frame stays square. In the evening I spent more time in cad designing mounts for the electronics on the frame, as well as my spindle mount. Day 14 Today I spent the morning doing the first power ups of my case. I had just finished my last AC cable that I needed, and then I Got everything hooked up and turned on, although the first time I went to test, the circuit shorted and the power strip turned off. I just had a small short that was caused by a piece of over stripped wire, after I fixed that I turned it on, and got all green lights. We have power, and now all I have to work on is the computer side of the system. In th...

Wednesday - Saturday

Today I worked on in metal shop getting everything ready to weld. This is a critical and time consuming process because I need to ensure that the frame is square and straight. This involves a lot of machine work on top of welding. I am getting it done though the X axis frame is coming along well, and I think that I should be ready to weld by around Saturday. Today I worked on finishing up the limit switch wires in the morning and started getting the computer system set up. I spent the afternoon machining my steel to length in the metal shop. I should be able to weld the top rails by tomorrow, and then I can machine them and weld them up to my other bars. Also the surface plate should be here tomorrow. The surface plate came today, and I welded the top rails, hopefully will be able to clean up the welds, and then start drilling the parts. It is gonna take some machining to make sure everything is square and flat. This is critical as to make sure that the rails are...