Today I Worked on finish machining my frame rails. At this point all I have to do is drill and weld my frame members after that my rails should simply mount up, and the frame can mount to the granite base. It has taken a while but both side are simtical within a hundreth of an inch on all critical dimensions. After this all that I need to get is my plates to bolt the machine together, with my electronics package. After that the only thing I would have left would be to do my mains wiring and setup junction boxes to ensure I have proper power delivery to the whole machine. This is important because this machine could draw more than 3000 watts from wall at peak use, which is not a small amount of power. This is something that I will have do in the location that I am going to install the machine.