Skip to main content
CNC Milling Machine Project Day 2

Today I worked on making the case for my electronics. I spent the morning at the woodshop installing a wood back panel in the PC case. After that I went back to shirley hall and reinforced the back panel and screwed it to the case. After that I spent time designing mounts for all my electronics inside the case. I also took the time to do some more design work on the CNC, where I started to lay out my motor mounts, and my electronics mount. I spent the rest of the afternoon researching what the wiring work the I will need to do, and also how to wire the PSU’s to mains power.                            

Comments

  1. Nate, Sounds like you are making progress. It would be great if you could post some photos of your project. Have fun Dan

    ReplyDelete

Post a Comment

Popular posts from this blog

CNC Milling Machine Project Day 1 Today I worked on setting up my space in the english office. This induced organizing and assessing the parts that I have already received, as well as setting up the control pc, and wiring up my 3d printer and smaller CNC that I am using to learn g code programing. After that I worked out an issue with the shipping company, and did some more design work on the CNC. After that I went to the tech center to get an old PC case to house my motor controllers and other electronics inside. After I got the case I spent the rest of the day drilling out and rivets to take out the hard drive cases to make space for all of my electronics. The PC will house all of my stepper drivers, as well as my PSU’s and stepper motor breakout. The PC case also allows me good fan mounting to be able to cool my comments adquealty. Tomorrow I will go and get a sheet of plywood to mount in the back of my pc case to mount my electronics to.                                      

Wednesday - Saturday

Today I worked on in metal shop getting everything ready to weld. This is a critical and time consuming process because I need to ensure that the frame is square and straight. This involves a lot of machine work on top of welding. I am getting it done though the X axis frame is coming along well, and I think that I should be ready to weld by around Saturday. Today I worked on finishing up the limit switch wires in the morning and started getting the computer system set up. I spent the afternoon machining my steel to length in the metal shop. I should be able to weld the top rails by tomorrow, and then I can machine them and weld them up to my other bars. Also the surface plate should be here tomorrow. The surface plate came today, and I welded the top rails, hopefully will be able to clean up the welds, and then start drilling the parts. It is gonna take some machining to make sure everything is square and flat. This is critical as to make sure that the rails are