Today I Worked on finish machining my frame rails. At this point all I have to do is drill and weld my frame members after that my rails should simply mount up, and the frame can mount to the granite base. It has taken a while but both side are simtical within a hundreth of an inch on all critical dimensions. After this all that I need to get is my plates to bolt the machine together, with my electronics package. After that the only thing I would have left would be to do my mains wiring and setup junction boxes to ensure I have proper power delivery to the whole machine. This is important because this machine could draw more than 3000 watts from wall at peak use, which is not a small amount of power. This is something that I will have do in the location that I am going to install the machine.
Today I worked on in metal shop getting everything ready to weld. This is a critical and time consuming process because I need to ensure that the frame is square and straight. This involves a lot of machine work on top of welding. I am getting it done though the X axis frame is coming along well, and I think that I should be ready to weld by around Saturday. Today I worked on finishing up the limit switch wires in the morning and started getting the computer system set up. I spent the afternoon machining my steel to length in the metal shop. I should be able to weld the top rails by tomorrow, and then I can machine them and weld them up to my other bars. Also the surface plate should be here tomorrow. The surface plate came today, and I welded the top rails, hopefully will be able to clean up the welds, and then start drilling the parts. It is gonna take some machining to make sure everything is square and flat. This is critical as to make sure that the rails are...